Ircon Ltd., The Technological Solutions
EN БГ
Back
Boiler Deven 250 t/h, K8ProjectsBoiler Deven 250 t/h, K8
Period
2015–2016
Client
Foster Wheeler Energy Polish Sp. z o.o.

Boiler Deven 250 t/h, K8

A steel supporting structure designed for a high-capacity boiler producing 250 tonnes of steam per hour, with low atmospheric emissions.

IRCON Ltd. provided engineering for the supporting steel structure.